< back to Projects
Complete Renovation
OwnerFun at the Mall, LLC
ArchitectColab Architecture
Contract Amount ($)346,733
Response TimeLess than 90 days
SubcontractorsRoses Equipment, Power Plumbing, Cascade Acoustics, Dallas Glass, Herinck Painting, Berg Electric, Larruso Concrete, MADE, American Heating
Project Description
This fast track 1,680sf wine and martini bar was built in less than 90 days, and it includes a fully equipped kitchen and bar.
Highlights
The mahogany bar and trim package was fabricated and installed by MADE. The bar is suspended from the roof structure with a 15-foot wine tower. The $400(+)/sf bar is the first in the state of Oregon to have an Enomatic IX wine serving system.