< back to Projects

River West Church

LAKE OSWEGO, OREGON map »

Sanctuary Remodel

OwnerRiver West Church
ArchitectMark Siemieniec Architecture
Project ManagerRon Walter
Contract Amount ($)167,733
SubcontractorsThe Door Works
 
Project Description

New design for the sanctuary included removal of the existing platform and floor-to-ceiling walls (about 32 feet high at the ridge). Large gable end walls required significant modification. Energy efficient windows that follow the pitch of the roof were installed.  

Highlights

To maintain the character of the exterior of the building, the siding was salvaged and reused; new siding was located to match.  This helped to create an invisible remodel.